CENTERRA GOLD – ENDAKO MINE
& MT. MILLIGAN
Frost Group was contracted by Centerra Gold (Thompson Creek Metals) to Haul 475,000 Tons of Potential Acid Generating (PAG) Rock at the Endako Mine to the area adjacent to the tailings pond.
PROJECT SIZE: $4 million
DURATION: Sept. 2020 to June 2022
Frost Group was contracted by Centerra Gold (Thompson Creek Metals) to Load, Haul and Place 413,000 m3 of tailings to re-contour a tailings pond as part of the Endako Mine reclamation.
PROJECT SIZE: $6.2 million
DURATION: Aug. to Nov 2022
Supply heavy equipment, operators and labour for onsite mine works at Mt. Milligan.
PROJECT SIZE: $3 million
DURATION: June 2020 – Ongoing