Frost Group completed 35 km of right of way clearing for ConocoPhillips near Wonowon, BC in early 2018. HRFL then carried out a reclamation and roll back project over the same site to prepare for pipe installation.

PROJECT SIZE: $6.5 million

DURATION: Aug. 2019 – Ongoing